- Role
- Country
- Date of registration
- Address
US-MF-000002321No certificates registered for this manufacturer.
No certificate references this Basic UDI-DI, because: • It does not require a certificate, or • It only requires a certificate without a Basic UDI-DI reference (e.g. a QMS certificate), or • The required certificate(s) referencing this Basic UDI-DI have not been registered yet.TC ADDITIONAL LONG LEADS KIT: IEC is an EU MDR-regulated medical device registered in EUDAMED. It is classified as Class I. Manufactured by Philips Medical Systems. Placed on the EU market in Austria. Explore certificates, regulatory status and the EUDAMED record on MD Atlas.
EUDAMED last updated this device on Jan 3, 2025
0884838BM511SQPrimary DI
The Primary DI is the main UDI-DI a manufacturer designates as the principal identifier for a device in EUDAMED.
(01)00884838015005
The compliance carrier: encodes the device identifier plus the production identifiers (lot, serial, dates) registered for this device.
Sterile
A sterile device is supplied free of viable micro-organisms — flagged so that it is handled, stored and used to preserve that sterile state.
Single-use device
A single-use device is intended to be used on one patient during a single procedure and then discarded — not reprocessed or reused.
Contains latex
A "contains latex" flag warns that a device contains natural rubber latex, which can trigger allergic reactions in sensitive patients.
CMR substance
A CMR flag warns that a device contains a substance that is carcinogenic, mutagenic or toxic to reproduction above a defined threshold.
Endocrine-disrupting substance
An endocrine-disruptor flag warns that a device contains a substance with endocrine-disrupting properties above a defined threshold.
Primary placement in Austria; available across 27 countries total.
| Country | On market since | Until |
|---|---|---|
| AustriaPrimary placement | Jun 20, 2007 | Mar 31, 2026 |
| Belgium | Jun 20, 2007 | Mar 31, 2026 |
| Bulgaria | Jun 20, 2007 | Mar 31, 2026 |
| Cyprus | Jun 20, 2007 | Mar 31, 2026 |
| Czechia | Jun 20, 2007 | Mar 31, 2026 |
| Germany | Jun 20, 2007 | Mar 31, 2026 |
| Denmark | Jun 20, 2007 | Mar 31, 2026 |
| Estonia | Jun 20, 2007 | Mar 31, 2026 |
| EL | Jun 20, 2007 | Mar 31, 2026 |
| Spain | Jun 20, 2007 | Mar 31, 2026 |
| Finland | Jun 20, 2007 | Mar 31, 2026 |
| France | Jun 20, 2007 | Mar 31, 2026 |
| Croatia | Jun 20, 2007 | Mar 31, 2026 |
| Hungary | Jun 20, 2007 | Mar 31, 2026 |
| Ireland | Jun 20, 2007 | Mar 31, 2026 |
| Italy | Jun 20, 2007 | Mar 31, 2026 |
| Lithuania | Jun 20, 2007 | Mar 31, 2026 |
| Luxembourg | Jun 20, 2007 | Mar 31, 2026 |
| Latvia | Jun 20, 2007 | Mar 31, 2026 |
| Malta | Jun 20, 2007 | Mar 31, 2026 |
| Netherlands | Jun 20, 2007 | Mar 31, 2026 |
| Poland | Jun 20, 2007 | Mar 31, 2026 |
| Portugal | Jun 20, 2007 | Mar 31, 2026 |
| Romania | Jun 20, 2007 | Mar 31, 2026 |
| Sweden | Jun 20, 2007 | Mar 31, 2026 |
| Slovenia | Jun 20, 2007 | Mar 31, 2026 |
| Slovakia | Jun 20, 2007 | Mar 31, 2026 |
Primary DI
The Primary DI is the main UDI-DI a manufacturer designates as the principal identifier for a device in EUDAMED.
00884838015005Basic UDI-DI
The Basic UDI-DI is the main identifier that groups together all device variants of the same model — the regulatory "family" key.
0884838BM511SQ989803151781UDI issuing entities
Issuing entities are the organisations the European Commission has designated to assign Unique Device Identifiers under the EU's UDI system.
MDR risk classes
MDR risk classes rank medical devices from lowest risk (Class I) to highest (Class III), which determines how much regulatory scrutiny they face.
European Medical Device Nomenclature — the EU product classification assigned to this device.
Z12050380ELECTROCARDIOGRAPHS - HARDWARE ACCESSORIESB-00884838094840On the marketStandard 10-lead Patient Cable IEC0884838BM511SQOn the marketTC ADDITIONAL LEADS KIT: IEC0884838BM511SQOn the marketThermal Array Recorder Paper, 10 RL0884838BM336SWOn the marketTHERMAL PAPER - A40884838BM336SWOn the marketTHERMAL PAPER - ENGLISH0884838BM336SWOn the marketNo certificate specifically references this device's Basic UDI-DI.